Welcome to the Alteryx Knowledge Base

DCM: Developing Designer Workflows with Shared Connections and Uploading Them to Server
user

Created/Edited - 9/29/2025 by Marcela Abrach | Alteryx

Question

How do I develop Designer workflows with shared connections and upload them to Server?  

 

Answer

To develop workflows in Alteryx Designer using shared connections and uploading them to the Server, follow these steps:


Step 1: Configure Shared Connections in Designer

  1. Open Designer Connection Manager:
  • Go to File > Manage Connections.
  1. Add a New Credential:
  • Navigate to Credentials.
  • Click + New.
  • Enter the Credential Name.
  • Select a Method and provide the required information (e.g., Client ID, Secret Key, Username, and Password) based on the selected method.
  • Click Save.
  1. Add a Data Source:
  • Navigate to Data Sources.
  • Click + New.
  • Choose the Technology.
  • Enter the necessary details for the technology you are connecting to, such as Datasource Name, Server, Driver, Host, or Database.
  • Optionally, click Test Connection to verify the connection.
  • Click Save.
  1. Link Credential to Data Source:
  • In the Data Sources > Connections section, select + Connect Credential.
  • Choose an Authentication Method.
  • Enter the credential information.
  • Optionally, select Allow connection for SDK.
  • Click Create and Link.


Step 2: Develop the Workflow

  1. Create a New Workflow:
  • In Alteryx Designer, select File > New Workflow to create a new workflow.
  1. Use Shared Connections:
  • When adding tools to your workflow that require data connections, select the shared connections configured earlier.
  • Ensure that the data sources and credentials used in the workflow are correctly referenced.
  1. Build and Test Workflow:
  • Add the necessary tools and configure them according to your workflow requirements.
  • Test the workflow locally to ensure it runs correctly using the shared connections.


Step 3: Upload Workflow to Server

  1. Prepare Workflow for Upload:
  • Ensure the workflow is saved and all necessary shared connections are correctly configured.
  1. Upload Workflow to Server:
  • In Designer, go to File > Save As.
  • Choose Alteryx Server from the options.
  • Connect to the Alteryx Server by providing the server URL and your credentials.
  • Select the appropriate location on the server to save the workflow.
  • Click Save to upload the workflow to the server.
  1. Verify Workflow on Server:
  • Log in to the Alteryx Server UI.
  • Navigate to the location where you uploaded the workflow.
  • Run the workflow on the server to verify it executes correctly using the shared connections.


Step 4: Maintain and Manage Workflow

  1. Update Connections if Needed:
  • If there are any changes in data sources or credentials, update them in the Designer Connection Manager and ensure the workflow references the updated connections.
  1. Monitor Workflow Execution:
  • Use the Alteryx Server UI to monitor the execution of the workflow, check for any errors, and make necessary adjustments.
  1. Sync DCM Connections:
  • Ensure that the DCM connections are synced between the development and production environments to avoid "Selected Connection is not available" errors.

By following these steps, you can effectively develop workflows in Alteryx Designer using shared connections and ensure they are properly uploaded and managed on the Alteryx Server.
Additional Information
Was this article helpful?